<tr id="qvs0u"><nobr id="qvs0u"><delect id="qvs0u"></delect></nobr></tr>

<small id="qvs0u"></small><tr id="qvs0u"></tr>
<ins id="qvs0u"><video id="qvs0u"><var id="qvs0u"></var></video></ins>
  • <tr id="qvs0u"></tr>
  • Welcome to [ Jiangsu Kengbo Heavy Industry Co., Ltd. ] Official Website!

    HOME    |    Contact us    |    Sitemap

    13585000194
    15861488616
      CONTACT US
    • Contact: Mr.Wang
    • Mobile: 13585000194
    • Mobile: 15861488616
    • Tel: 0510-85388408
    • Fax: 0510-85388408
    • Web: www.pawsinspace.com
    • E-mail: sales@wxkbjx.com
    • 502492439@qq.com
    • Add: 42 Yuanqiao Road, Yixing
    • Economic Development
    • Zone, Wuxi City
    PROBLEM

    Position:Home > PROBLEM >

    Advantages of Construction of Fully Mechanized Draft

    Safe and reliable, on the soil disturbance small clearance clearance Pile construction method in the steel casing within the clearance pile and backfill construction, the underground undisturbed soil or damage is not small, the underground soil does not cause disturbance or produce a small The disturbance. As the steel casing on the hole wall support, in the steel casing around the soil stress has not yet released, it has been removed and timely backfill obstacles, the surrounding structures had no effect.

    Prev:None

    Next:None

    中文字幕有码中文无码_国产成人精品免费大全_少妇性饥渴无码a区免费_vr专区自拍无码中文字幕精品